黄大仙精选资料二四六

提高打胶机工作的相关操作

发布时间:2018/04/23    发布人:

  YINSHUANGZUFENJIAOSHIYOULIANGZHONGJIAOHUNHEERCHENGDE,QININGGUSUDUYUHUANJINGWENDUHEA、BJIAODEBILIYOUGUAN,HUNHEHOUDEJIAOYIBANZAI20FENZHONGZHINEIJIUHUIFANYINGGUHUA。SUOYI,DANGSHEBEIZAIZHENGCHANGDAJIAOHOU,20FENZHONGZHINEIBUSHIYONGJIUBIXUJIANGHUNHEHOUDEJIAOCHONGXICHULAI,YIMIANDUSAIHUNJIAOQIHEJIAOQIANG。JUTICAOZUO:JIANGBBENGGUANBI,DAKAIBJIAOHUILIUKAIGUANRANHOUDAKAIJIAOQIANG,ZHIJIAOTIAOWEIBAISEJIKE。

黄大仙精选资料二四六  Because the double component glue is made from two kinds of glue, the solidification rate is related to the ambient temperature and the proportion of A and B glue. The adhesive after mixing is generally cured in 20 minutes. Therefore, when the equipment is normally glued, it is necessary to rinse the mixed rubber after 20 minutes without use, so as not to jam the glue mixer and glue gun. Specific operation: turn off the B pump, open the B rubber reflux switch and turn on the glue gun, then the adhesive strip will be white.

  1)SONGKAIBILIGANGGANSHANGDEBILIBENGSUOJINLUODING,JIANGBILIBENGNEIWAIDIAOZHENGZHISUOXUBILI。ZHIYOUDANGAJIAOHEBJIAODEPEIBIDADAOZHENGCHANGZHISHI,CAIKEJINXINGXIAMIANDECAOZUO。

  1) release the proportional screw on the proportional lever and adjust the proportion of the pump inside and outside to the required ratio. Only when the ratio of A glue and B glue reaches the normal value can the following operation be carried out.

黄大仙精选资料二四六  2)ZHIXUANZEXUANNIUYUA、BBENGKAI,JIANGJIAOQIANGCHUKOUDUIZHUNLIANGPIANBOLIDEZHONGFENG,DAKAIJIAOQIANGKAIGUAN,YISHIDANGSUDUPINGWENDIYIDONGJIAOQIANGSHIBOLICAONEIDESHUANGZUFENJIAOTIANMANCHONGSHIWEIJIA。DAJIAOJIESHUSHIGUANBIJIAOQIANG。

双组份打胶机

黄大仙精选资料二四六  2) put the selection knob on the A and B pump, aim the exit of the glue gun at the middle seam of the two glass, open the glue gun switch, and move the glue gun at the proper speed to fill the double component in the glass groove. Turn off the glue gun at the end of the glue.

  5、GENGHUANJIAOTONG:

  5, replace the glue bucket:

黄大仙精选资料二四六  1)DANGJIAOTONGNEIDEJIAOYONGWANSHI,YINGLIJIGUANBIA、BKAIGUAN,TINGZHIDAJIAO。

  1) when the glue in the plastic bucket is used up, A and B switches should be closed immediately.

黄大仙精选资料二四六  2)DAKAIA(HUOB)JIAOBENGCHONGQIKAIGUAN,XUANZEA(HUOB)JIAOBENGTISHENGJIGOUWEISHANGSHENGWEIZHI,DIANDONGXUANNIUSHIYAPANMANMANTIQI,CISHIYINGZHUYI:JIAOTONGJINLIANGBUYAOLIKAIDIPAN,ZHIZHIYAPANWANQUANTUOLIJIAOTONGSHIGUANBIA(HUOB)JIAOBENGDECHONGQIKAIGUAN。3)CHECHUKONGTONG,JIANGXINJIAOTONGZHIYUGONGZUOWEIZHI,ZHONGFUDI3、4、XIANGCAOZUO。

黄大仙精选资料二四六  2) open A (or B) glue pump inflatable switch, select A (or B) glue pump lifting mechanism to rise position, point move knob to lift the plate slowly, at this time should pay attention to: glue barrel do not leave the chassis as far as possible, until the press disc is completely out of glue barrel to close the inflatable switch of A (or B) glue pump. 3) withdraw empty barrels, place the new plastic bucket in the working position, repeat the third, fourth item operation.

  本文的精彩内容来自双组份打胶机详细内容请点击我们的官方网站:http://emikasarl.com谢谢您的到来!

  The highlights of this article are from two groups of glue dispenser. Please click on our official website: http://emikasarl.com thank you for coming.